↓
 

Plum Island Outdoors

P. I. Outdoors supports Eco-Friendly Outdoor Activities.

  • About
    • Projects
    • Donate
    • Key People
    • Partners
  • Donate
  • Outdoor Activities
    • Bird Watching
      • How to Get Children Started With Bird Watching
    • Walking
      • Hellcat Boardwalk Trail
        • Ludlow Griscom
      • Stage Island Trail
      • Pines Trail at Parker River National Wildlife Refuge
      • Sandy Point State Reservation Trails
    • Water Trails
      • Water Trails in Parker River National Wildlife Refuge
    • Fishing on Plum Island
    • Plogging
  • Climate Change
    • Newburyport Climate Resiliency Plan
    • Renewable Energy
      • Solar/Wind Energy
  • History
    • Anchorage
    • Camp Sea Haven
      • Knobbs Lifesaving Station
      • Memories Of Camp Sea Haven
    • Grape Island
    • The Pink House
      • Pink House Property Swap – 2016 Plan
      • Questions and Answers About The Pink House
    • Burgess Aerodrome
  • Events
    • Walking Tours of Plum Island, Cost
  • Gallery
    • Matt Poole Collection
    • Bill Sargent Collection
    • Plum Island Point, Walk/Talks
  • Did You Know?
  • Store
  • Contact Us
Home→Categories Merrimac River Dredging

Category Archives: Merrimac River Dredging

Plum Island Point Live Cam

Plum Island Outdoors Posted on March 10, 2023 by AndyMarch 10, 2023

BOAT TRAFFIC APPROACHING THE MOUTH OF THE MERRIMACK RIVER BEACH EROSION AND DEPOSIT OF SAND AT RESERVATION TERRACE The Plum Island Point Live Cam provides picturesque views of boat traffic approaching the Mouth of the Merrimack River. This camera displays … Continue reading →

Posted in Merrimack River, Plum Island Point | Leave a reply

Dredger Leaving Area; Project Remains On Hold

Plum Island Outdoors Posted on February 22, 2023 by AndyFebruary 22, 2023

NEWBURYPORT — The Oyster Bay dredger is leaving the area after almost two months of little to no progress. The U.S. Army Corps of Engineers has been working with H&L Contracting of New York to dredge 226,000 cubic yards of … Continue reading →

Posted in Dredging, Merrimac River Dredging, North Reservation Terrace, Plum Island Point | Leave a reply

Newburyport Harbor Maintenance Dredging Project

Plum Island Outdoors Posted on October 20, 2022 by AndyOctober 20, 2022

The Plum Island dredging project is well underway. The Newburyport Mayor’s Office receives daily updates from the Army Corps of Engineers. Please follow this link for more information on the dredge.

Continue reading →
Posted in Merrimac River Dredging, North Reservation Terrace, Plum Island Point | 3 Replies

Recent Posts

  • This Sunday’s Walking Tour of Plum Island Point, Plum Island Beach is Canceled!
  • Plover Season is OVER for 2023
  • Plover Update – 8/11
  • Plover Update – 8/5
  • Plover Update – 7/8

Recent Comments

  • Louise Barnes on Put Sand Dunes on Plum Island’s New Beach
  • Louise Barnes on Put Sand Dunes on Plum Island’s New Beach
  • Brenda on Plum Island and the Colorado River
  • Maria Sterk on Put Sand Dunes on Plum Island’s New Beach
  • Scott E Ricker on Newburyport Harbor Maintenance Dredging Project

Archives

©2023 - Plum Island Outdoors - Weaver Xtreme Theme
↑
error

Enjoy this blog? Please spread the word :)

  • RSS
  • Follow by Email
  • Facebook
    fb-share-icon
  • Twitter
    Tweet
  • YouTube
  • FbMessenger